English

Dock levelers

NewGenH Hydraulic Dock Leveler
  • NewGenH Hydraulic Dock Leveler

An impressive combination of usability and longevity, Door Doctor Hydraulic Dock Levelers are high-performance systems that operate at the touch of a button. Strategically welded enhanced J-beams provide an exceptional level of structural sturdiness, improving product lifetime.

Hydraulic deck and lip cylinders increase operating efficiency and reduce maintenance requirements, resulting in a significantly lower cost of ownership compared to mechanical units. Optional independent lip control is available for all models, decreasing both cycle time and energy use (Blue Genius™ Touch Control Panel required).

Superior craftsmanship, ease of operation, and a robust suite of advanced safety features make the Hydraulic Dock Leveler an ideal choice for increased productivity at the loading dock.

  • Eight (8) enhanced J-beam channels are welded to the underside of the deck at dynamic impact points to prevent distortion and extend the lifetime of the dock leveler.

    • Platform flexes up to 4" (102mm) under load, maintaining full-width contact between the lip and the truck bed
    • Inverted deck cylinder self-bleeds continually, reducing internal corrosion and increasing velocity fuse efficiency
    • Continuous one-piece headboard system intensifies the strength of the deck’s front structure
    • High tensile J-beams allow the deck to flex side to side while maintaining back to front rigidity without distorting
    • High-volume loads
    • Frequent usage (24-hour operations)
    • Fast-paced environments
    • Blue Genius™ Touch Control Panel
    • Assured Motion Float
    • Vehicle restraint
    • Lights communication package
    • 18” (457mm) and 20” (508mm) long lips
    • Brush and rubber weather seals
    • Environmentally friendly biodegradable oil
    • Pour-in pan to facilitate new construction
    • New construction pit kit

    Structural Integrity

    Eight (8) enhanced J-beam channels are welded to the underside of the deck at dynamic impact points to prevent distortion and extend the lifetime of the dock leveler.

    Product Highlights

    • Platform flexes up to 4" (102mm) under load, maintaining full-width contact between the lip and the truck bed
    • Inverted deck cylinder self-bleeds continually, reducing internal corrosion and increasing velocity fuse efficiency
    • Continuous one-piece headboard system intensifies the strength of the deck’s front structure
    • High tensile J-beams allow the deck to flex side to side while maintaining back to front rigidity without distorting

    Recommended Applications

    • High-volume loads
    • Frequent usage (24-hour operations)
    • Fast-paced environments

    Available Upgrades

    • Blue Genius™ Touch Control Panel
    • Assured Motion Float
    • Vehicle restraint
    • Lights communication package

    Available Options

    • 18” (457mm) and 20” (508mm) long lips
    • Brush and rubber weather seals
    • Environmentally friendly biodegradable oil
    • Pour-in pan to facilitate new construction
    • New construction pit kit


NEED INFORMATION ?

To receive a free quote or for information about our products, fill out the form below. We will contact you as soon as possible.
Invalid Input
Invalid Input
Invalid Input
Invalid Input
Invalid Input
Invalid Input
Invalid Input
Appointment
English